Picture after assembly
Boot sequence:
1. Pump power supply and water circulation are normal
2. Plug in the main power
3. Wait for seven or eight seconds to stabilize the voltage before closing the air switch to start heating.
The shutdown sequence is the reverse of the startup sequence.
WhatsApp us
Picture after assembly